Case study04 / 04

Abnormal-load transport for a factory relocation

Sector
Industrial manufacturing
Route
Central Europe, cross-border
Timeline
Delivered on schedule

The challenge

A manufacturing client needed a 14-metre production press relocated between two plants, requiring special permits, escort vehicles and route planning around height and weight restrictions.

A 14-metre press does not fit any standard trailer profile. The move required abnormal-load permits in two countries, certified escort vehicles, and a route survey that accounted for every bridge height and axle-load limit along the way.

The solution

Our team coordinated abnormal-load permits, arranged escort vehicles and mapped a custom route days in advance, delivering the press fully intact and on schedule.

Permits were secured days ahead, the route was driven and documented in advance, and the convoy moved in a night window agreed with the authorities, with the press anchored and monitored throughout.

The results

  • 14 mCargo length
  • 2Countries permitted
  • 0Damage incidents
  • 100 %On-schedule delivery

Next case study

All case studies

01 / 04Aviation · Prague to Brussels

Aircraft on ground: a hot shipment overnight

AOG protocol launched in 15 minutes. The certified part went non-stop to the Brussels hangar, live-tracked the whole way.

Get in touch

Your shipment could be the next one.

Tell us what needs to move. Our team gets back to you within 15 minutes, any hour, weekends and public holidays included.